Nigeria to begin local aircraft assembly, as FEC approves N2.3 billionĀ for Magnus Aircraft
FG says the total contract sum is N2.3 billion with a completion period of 18 months.
FG says the total contract sum is N2.3 billion with a completion period of 18 months.