New report has emerged that aircraft manufacturer, @Boeing, was aware of fault on the 737 Max models long before the @lionairgroup and @flyethiopian Airlines crash that claimed the lives of all passengers on board the planes.
Engineers were pushed to submit technical drawings and designs at roughly double the normal pace. Consequently, a production that was slated for six years was built months later.